built-up bridge造句
例句与造句
- Deck pavement of built - up bridge may be too thick or thin due to complex reasons , among which a most important one is the design
摘要装配式桥梁建造时会出现桥面铺装厚度过薄或过厚的现象,原因很复杂,但设计是一个重要原因。 - Conventional method of designing built - up bridge can only ensure the deck pavement thickness near the ends of beams , without enough regarding of the middle part
装配式桥梁的常规设计方法一般只能保证支座附近的桥面铺装厚度,桥梁的中间部分则无法保证。 - A baseline finite element model must be a full three - dimensional model that can reflect the built - up bridge conditions comprehensively and correctly . in addition , it must be a model properly validated by the bridge field tests
斜拉桥基准有限元模型首先应该是能够全面、正确反映结构真实性态的完整的计算模型,其次,它还应该是经现场试验验证了的有限元模型。 - It's difficult to find built-up bridge in a sentence. 用built-up bridge造句挺难的